Case Study – Flow 2a Problem
In this case study, we were called out to a stairlift repair. (See our page on repairs, servicing and maintenance). This was a problem with a Flow 2 a in Leeds, West Yorkshire. This stairlift had a retro-fitted “park point”. The park point is where the stairlift parks to charge the battery. After the original…


